I was asked to appear as an ecological expert witness at a public inquiry for a 4-turbine onshore wind farm development adjacent to Torr Works Quarry in Somerset.

​The main issues related to potential impacts of the wind turbines on bats, birds (peregrine falcon) and dormice.


​Bats were the most contentious ecological constraint, with the site located next to ancient woodland; a mitigation strategy was developed to prevent or reduce effects on bats. 

​While the wind farm appeal was not successful for non-ecological reasons, the mitigation strategy developed was deemed to adequately minimise the risks associated with ecology and ensure that there were no likely significant effects. 
​​